Glazing Refurbishment Blog
19/04/13 - Fetter Lane High Level Glass ReplacementsGlazing Refurbishment has over this weekend completed the replacement of 10no large high level damaged glass units within Central London’s busiest commercial districts. (Access photos Here)
Glazing Refurb’s dedicated high level glaz..
10/04/13 - GSK High Level Glass ReplacementFollowing an urgent call from one of our largest clients Glazing Refurbishment Limited have this weekend conducted the replacement of 1no point fixed DGU at our blue chip clients flagship UK headquarters.(Access photos Here)
Our cli..
08/04/13 - Hammersmith Glass ReplacementsGlazing refurbishment were following an industry recommendation invited to attend this premier West London Office Complex and remove and replace multiple, large high level damaged glass units. (Access photos Here)
G G Contracts Limi..
01/03/13 - Fleet House PlaceHere are photos of our recent project in the Holborn area of central London (access them on Facebook Here). Our client required the replacement of 4 existing defective DGU's with new louvre details.
Difficulty in accessing the workf..
27/02/13 - Canary Wharf Emergency RepairsFollowing an urgent call from our long-standing client at Canary Wharf - Glazing Refurbishments Emergency make safe team were sent out to conduct a high level, difficult access repair to the buildings 12th Floor balustrade glazing (Acc..