Glazing Refurbishment Blog
25/11/16 - Commercial to Residential Glazing Works ContinueGR's Large Works Division continue with window installation overhaul to transform a large commercial building into residential apartments.
Our latest site pictures depict two of our IPAF trained teams accessing the glazing face of..
18/11/16 - Glazed Atrium Works ContinueGlazing Refurbishment's Northern based Large Works team continue with the phased refurbishment of four sizeable glazed atriums and a central glazed rotunda to a large Scottish government building located in Edinburgh.
Our latest sit..
11/11/16 - Curtain Wall Unit ReplacementsWorking for an interior fit out company, Glazing Refurbishment were contracted to complete multiple glass unit replacements across a commercial site located in Southern England. Due to the sites perimeter located near a live rail track..
04/11/16 - GR rope access team complete 7th floor glass replacementSpecialists in high level and difficult to access glass units, our latest site pictures show our rope access team conducting a 7th floor DGU replacement to a central Birmingham high rise building.
To commence with works our IRATA t..
28/10/16 - Atrium refurbishment works complete to Premier Shopping Centre DestinationGlazing Refurbishment’s Northern based Large Works division have completed the phased overhaul package to the large glass roof/atrium at one of Scotland’s Premier Shopping Centre Destinations.
To avoid major disruption to the shopp..