Specialists in high level and difficult to access glass units, our latest site pictures show our rope access team conducting a 7th floor DGU replacement to a central Birmingham high rise building. To commence with works our IRATA trained operatives removed the damaged unit and passed through to our operatives inside the building. After removing the damaged unit, our team cleaned the aperture and prepped ready for the new unit to be installed.
After successful installation of the new unit, our team completed the works with the installation of weather seals and clean down of the new unit.
If you have a high level or difficult to access damaged glass unit requiring replacement, speak to our team today on 0207 183 6551 to explore your options.