06/06/16 - Controlled Glazing Removal CompletedGlazing Refurbishment's Specialist Demolition Division have just completed the controlled removal of the glazing from an existing curtain wall on this Central London site.
Our team showed the range of skills at our disposal, utilising..
06/06/16 - High Level DGU ReplacementGlazing Refurbishment High Level team this weekend completed the replacement of a defective DGU at this iconic Milton Keynes Leisure Complex.
Due to the unique sloped design of the curtain walling, our team used the combination of a s..
24/05/16 - Buttermarket Shopping Centre Works CommenceGlazing Refurbishment specialist glazing demolition division have just commenced with the controlled glazing removal operation of the bespoke glazed façade over the St Stephens Lane entranceway to the Buttermarket Shopping Centre in Ip..
16/05/16 - Bespoke Glazing Panel ReplacementGlazing Refurbishment specialist access division this weekend completed the replacement of a damaged bespoke glazing panel to the entrance canopy of this London shopping centre.
Prior to works commencing our procurement team sourced..
09/05/16 - High Level Division Complete Specialist ReplacementThe Glazing Refurbishment high level division this weekend completed the specialist replacement of a defective overhead double glazed unit in this Central London Headquarters.
Prior to works commencing, our procurements team sourced..