Glass Box
Client: Ballymore Construction
Location: Docklands
Cost: £50,000
Length: Ongoing
A prime office location floating within the Isle of Dogs required a specialist contractor to conduct overhead glass replacement and to conduct overhead glass replacements.
The unique location of the office led the team to utilise a mobile tower crane in order to assist with the removal of defective units and to
manoeuvre the replacement DGU into the aperture.
A number of additional safety measures were required to conduct works on site including secondary safety straps, two way radios, ropes/harnesses as well as water buoyancy aids when the team were working near the building edges.
The unique location of the office led the team to utilise a mobile tower crane in order to assist with the removal of defective units and to
manoeuvre the replacement DGU into the aperture.
A number of additional safety measures were required to conduct works on site including secondary safety straps, two way radios, ropes/harnesses as well as water buoyancy aids when the team were working near the building edges.