Spires Shopping Centre
Client: Bolt and Higgs
Location: London
Cost: £100,000 - £125,000
Length: September - October 2014
Spires Shopping Centre required a full refurbishment of the existing glazed mall/atrium. This large scale operation involved the complete removal and disposal of the existing glass units and system components.
The project was conducted solely at height so a wide array of access equipment was utilised both internally and externally during the works and this was key when installing the new glazed units and replacement components.
In order to meet a tight deadline, we utilised both day and night teams to ensure the works were completed to the client’s pre-determined schedule.
The project was conducted solely at height so a wide array of access equipment was utilised both internally and externally during the works and this was key when installing the new glazed units and replacement components.
In order to meet a tight deadline, we utilised both day and night teams to ensure the works were completed to the client’s pre-determined schedule.