Buttermarket Shopping Centre Works Complete
28th June 2016
Glazing Refurbishment’s specialist glazing demolition division have successfully completed the controlled removal of the bespoke glazed façade entranceway to the Buttermarket Shopping Centre in Ipswich, Suffolk. Tasked by our client to complete this precise demolition to a tight deadline, our team worked through the night during the four week project to minimise disruption to the general public and allow internal construction works to take place during the day.
Attached are images showing the final stage of the demolition project with the central ring being the final piece of the structure to be removed. Throughout this works, our Projects Team sourced a variety of specialist access cranes to assist with the removal of the large glazed panels and steel framework.
The successful deconstruction has now revealed the new look food court and leisure complex which is due to open this Summer.
Glazing Refurbishment Demolition Division are the leading UK specialists in the controlled removal of specialist glazing structures and as such partner and work with many of the country’s leading demolition companies.
Should you have a project requiring specialist glazing removal then contact us today on 0207 183 6551
» Blog