Abseil Division Complete Office Block Building Inspection
12th May 2017
Glazing Refurbishment abseil division, GG Abseil Services, www.ggabseilservices.co.uk, was contacted by one of our facilities management clients who instructed us to conduct a comprehensive, external building inspection of a large high rise office block within central London. We were instructed to carry out the inspection using rope access as a result of the numerous benefits over alternative access methods. By using rope access technicians, the inspection time was rapidly decreased with minimal disruptions to the building occupants. There is no need for scaffold assembly nor the constant repositioning of MEWPs to cover the entire building face.
Like with all our inspections, upon completion a photographic report is produced and issued to the client detailing any matters arising as a result of the inspection.
If you have any glazing or abseil requirement, large or small, please contact our sales departments on 0207 183 6551, visit www.londonglazingrefurbishment.co.uk or email info@glre.co.uk
» Blog